- AREA East Project - EPC2B pipeline project - Jacket GR4
- Detailed design of the AMD3 platform
- BONGA Project J-Lay Tower installed on POLARIS barge
- Rack study Syria
- Detailed design of the AMD3 platform
- Detailed design of the GRMPFC-GRMPFH bridge
- Detailed design of PPE - DPG - WPE1 - WPE2 - WPE3 jackets (Persian Gulf)
- "Approuved for construction" dossier of the SCF - Chevron platform
- Detailed design of the Orion Stinger barge
- "Approuved for construction" dossier of the D1B tripod
- Study to modify the POLARIS barge for deep-sea use
- N'KOSSA project - design of risers
- GIRASSOL project - Monitoring and follow-up
- AMENAM project - Design of steel jackets
- VUKO-KUNGULO project - Design of steel jackets, risers and caissons
- SANHA project - Design of steel jackets
- AK Sud platform - Re-qualification with extension
- Drilling campaigns
- Design of modules
- L4A and F15 certification file
- AIRBUS - M24 test division - Building B29
- SHAPKINO Project - Detailed design of structures
- ARKEMA project - OREVAC workshop
- Several toll booth canopies on the A63, A64 and A9 motorways (assessment, extension, reinforcement etc.)
- Mont-de-Marsan air base - E.D.S.A Passe dérive building
- Mérignac air base - Structure diagnostic
- Various structures (buildings, villas, glass canopies, domes, etc.) for Saudi Arabia
- Cindy Project - Buildings U1 and U0
- Mourenx district office
- Marignac and Beyrede factory
- ALCATEL Toulouse structure building
- Expertise building AZF Toulouse
- SNPE Toulouse (various buildings and production towers - assessment - Reconstruction)
- Mega Joule Laser CEA
- Incineration plant Toulouse
- Case Tower (launch ramp) Kourou
- TOLOCHIMIE Toulouse
- Tarbes Ossun Lourdes air terminal